Contents · 8
Author: Ethan | Source review: October 28, 2026.
A shipment may leave a factory in China, travel by sea to Umm Qasr and continue to a Baghdad warehouse. The buyer–seller trade term, the freight forwarder’s services and the charges actually incurred are related, but they are not the same agreement.
“CIF Umm Qasr” in a quotation does not mean every destination-port charge is included. “Delivery to Baghdad” does not necessarily include import duties, taxes or unloading. Before shipment, check trade responsibilities separately from the logistics scope to reduce the risk of discovering unarranged charges or procedures after arrival.
This article describes transactions in which the parties expressly adopt Incoterms® 2020. Actual responsibilities also depend on the specific contracts and shipment conditions. The examples are illustrative, not Jingyuan customer cases.

1. Separate three things: trade terms, logistics instructions and actual charges
Trade terms mainly define delivery, cost and risk responsibilities between buyer and seller. A forwarder’s quotation and instruction define the transport, consolidation and other services it undertakes. Actual charges depend on the charging terms of the carrier, destination service providers and relevant authorities.
A seller’s obligation to pay ocean freight does not mean the forwarder assumes destination charges not agreed beforehand. Asking the forwarder to “help contact customs” does not mean clearance, duties or delivery are included.
When confirming a plan, ask these questions separately:
Which trade term and version does the sales contract use, and what exact place is named?
Where does the logistics instruction start and end, and which legs are handled by Jingyuan or other providers?
Is each charge included, paid separately by buyer or seller, or subject to confirmation based on actual costs?
2. FOB: How are responsibilities divided around loading at the Chinese port?
Illustrative wording: FOB Ningbo Port, Incoterms® 2020.
Under the basic rule, the seller handles export formalities and loads the goods aboard the vessel nominated by the buyer. Risk of loss or damage transfers to the buyer when the goods are on board. The buyer generally arranges and pays for subsequent ocean carriage, import formalities and related charges.
For an actual China–Iraq shipment, check before booking:
1. The buyer-nominated carrier, vessel/voyage, port of loading and cargo-receiving time.
2. Who arranges and pays for factory pickup, warehouse receiving, export operations and terminal charges.
3. Whether the quotation ends at the destination port, and how release, collection, import procedures and inland transport will connect after arrival.
4. Who arranges insurance and whether it covers the actual route.
FOB is for sea and inland-waterway transport. For container cargo delivered to a terminal or carrier before loading, the delivery point and risk-transfer point may not align. ICC notes that FCA may be considered in such cases. The parties should agree based on the actual delivery place and contract; do not choose FOB solely because the cargo moves by sea. See ICC guidance on choosing Incoterms® rules.
3. CIF: The seller pays ocean freight, but risk does not necessarily transfer at destination
Illustrative wording: CIF Port of Umm Qasr, Incoterms® 2020.
Under the basic rule, the seller handles export formalities, loads the goods aboard, contracts and pays for carriage to the named destination port, and obtains insurance for the buyer’s transport risk as required by the rule.
A key distinction: paying freight to destination does not mean the seller bears cargo-damage risk all the way there. Under CIF, risk normally transfers to the buyer when the goods are on board at the port of shipment.
CIF specifies minimum insurance cover; it does not cover every loss or leg. Check the insured amount, cover, deductible, start/end points and claims process. Agree separately if higher cover is needed. ICC explains CIF and CIP insurance requirements.
After arrival, confirm whether unloading and terminal handling are included, and who handles release, import procedures, duties/taxes, storage, inspection and onward delivery. “CIF” or “port-of-arrival price” alone does not establish that all these items are included.
4. DAP: Delivery to the named place does not mean import charges and unloading are included
Illustrative wording: DAP a specific warehouse delivery point in Baghdad, Incoterms® 2020.
Under the basic rule, the seller arranges and pays for carriage to the named destination and bears transport risk before delivery. Delivery and risk transfer occur when the goods arrive at the named place on the arriving vehicle, ready for the buyer to unload.
Under DAP, the buyer generally handles import formalities and related duties/taxes, and normally unloads at destination. If the seller’s carriage contract includes unloading, avoid duplicate payment and check the contract for charges and unloading risk. See ICC’s DAP explanation.
For Baghdad or another Iraqi city, confirm before shipment:
Specify the warehouse or project site, not only the country or city.
Identify who handles import procedures, prepares documents, pays duties/taxes and completes required formalities.
Confirm who arranges the port-to-destination vehicle and whether it can access the site.
Confirm who supplies forklifts, lifting equipment or labour, and how waiting, redelivery and empty-container return are charged.
If import procedures are not ready, onward delivery may not connect as planned. Customs clearance is not Jingyuan’s standard service; if requested, Jingyuan can confirm the assistance available shipment by shipment based on cargo, destination and local resources.
5. Align responsibilities and charges for one shipment with a checklist
This checklist supports communication; it does not replace the sales contract or a formal logistics quotation:
Trade term: rule and version, plus the named loading port, destination port or delivery place.
Export and international carriage: who arranges and pays export formalities, booking, ocean freight and insurance.
Destination port: whether unloading, terminal handling, release, collection and possible waiting charges are included.
Import: who is the importer and who prepares, confirms and pays for documents, permits and duties.
Inland delivery: vehicle, exact address, unloading equipment, proof of delivery, waiting and empty-container return.
Unconfirmed items: responsible person, deadline and whether changed conditions require a revised quotation.
Mark unconfirmed charges “to be checked”; do not count them as zero. Providers may use different charge names. Check the charging party, billing basis and included scope to avoid omissions or duplicate charges.
6. What can Jingyuan help check?
Based on customer-provided cargo details and trading arrangements, Jingyuan can help map the scope and endpoints of China pickup, consolidation/container loading, export operations, international carriage and services already instructed. We can explain included, excluded and still-unconfirmed quotation items.
If destination clearance, local delivery or service to an Iraqi city is needed, Jingyuan will confirm scope and charges separately based on the shipment and local resources. Buyer and seller remain responsible for agreeing sales-contract responsibilities and payment.
Sources and scope
Source review date: October 28, 2026.
ICC website, iccwbo.org: Incoterms® 2020 overview and insurance explanation.
ICC website, library.iccwbo.org: Incoterms® 2020 rule-selection checklist.
ICC Academy website, academy.iccwbo.org: DAP and DDP responsibility distinctions.
This article explains the general framework and a shipment-discussion method. It does not mean all Iraqi ports, cargoes or carriers follow identical procedures and does not replace review of the specific sales contract, carriage contract, insurance terms or shipment.
Frequently asked questions
1. Under CIF Umm Qasr, must the seller pay every destination-port charge?
Do not assume so. Check which unloading and destination items the carriage contract includes, then separately confirm import formalities, duties/taxes and subsequent port charges.
2. If DAP is to a Baghdad warehouse, are import clearance and duties included?
Under the basic DAP rule, the buyer generally handles import formalities and related duties/taxes. Check the contract and shipment arrangements; “delivery to a warehouse” alone does not show that every charge is included.
3. If cargo is delivered to a China warehouse under FOB, has risk necessarily transferred?
Not necessarily. Under FOB, delivery and risk normally transfer when goods are loaded aboard at the named port of shipment. If container cargo is handed to the carrier before loading, the parties can assess a more suitable rule and specify the delivery place.
4. Does confirmation of a forwarder’s quotation automatically make it responsible for all seller obligations?
No. Review the sales contract and logistics instruction separately and define the services and charges the forwarder actually undertakes.
